ANY construction or maintenance activity within the jurisdictional area of the levee system, as detailed below, is subject to review by the levee maintenance district. Minor projects may be authorized under a Letter of Permission as deemed appropriate by the Board and the District Engineer. More involved projects may require the issuance of an Encroachment Permit. Additionally, certain activities may require permits or permissions from other regulatory bodies at both the State and Federal level such as:
It is the Applicant's responsibility to ascertain which permissions are required and to comply with all regulatory authorities.
Classification |
Levee Mile or Levee Section |
Distance from Centerline of Levee Landside (feet) |
Distance from Centerline of Levee Waterside (feet) |
---|---|---|---|
PROJECT LEVEE | |||
Georgiana Slough | Mile 0.00 to 6.02 | 250 | 75 |
Sacramento River | Mile 0.00 to 10.20 | 150 | 75 |
NON-PROJECT LEVEE | |||
Mokelumne River | Section 0+00 to 150+00 | 250 | 75 |
San Joaquin River | Section 150+00 to 290+00 | 250 | 150* |
Sevenmile Slough | Section 290+00 to 531+25 | 200 | 75 |